eCFR
40 CFR 63.425 — Test Methods and Procedures (Gasoline Distribution, Subpart R)
The pass/fail numbers for the vapor test: how long it runs, the starting pressure and vacuum, and how much the reading can drop.
This is where the pass/fail numbers for the vapor test live.
Method 27 tells you how to run the pressure and vacuum test. It doesn't tell you what counts as a pass. This section does.
What's in it:
Paragraph (e)(1): how long the test runs, what pressure and vacuum to start at, and a table showing how much the reading is allowed to drop. The allowed drop depends on the size of the tank or compartment.
Paragraph (e)(1)(iii): which column of the table to use. Some limits get tighter on May 8, 2027.
Paragraph (e)(2): the internal vapor valve test you run after the pressure and vacuum tests.
DOT sends you here too. 49 CFR 180.407(h)(2) lets you use Method 27 as the leak test on fuel tanks with vapor recovery, and says the limits are in 63.425(e).
Know which limit applies. Some terminals go by a different rule with different limits. Ask the terminal or the customer which one they follow. Look up the current numbers on eCFR every time. They change.